Work Holloway and Co

Holloway & Co

Editorial site built around a measured drawing

Field
Construction and architecture
Build time
1 to 2 weeks
Discipline
Editorial
Tier
Standard, $3,500

A concept build for a fictional heritage leadwork firm in York, working on listed buildings.

The design problem

The design problem was the interesting part. Nobody ever sees a lead roof, so there are no photographs worth leading with. The site is built instead around a measured elevation drawing rendered as SVG, with a dated archive timeline running beneath it.

How it reads

Restrained, editorial and typographically led rather than image led. Proof that a site can carry real weight with no photo library behind it.

Holloway and Co, editorial site built around a measured drawing, screen 1
Holloway and Co, editorial site built around a measured drawing, screen 2
Holloway and Co, editorial site built around a measured drawing, screen 3
Holloway and Co, editorial site built around a measured drawing, screen 4
Holloway and Co, editorial site built around a measured drawing, screen 5

Build notes

Vanilla HTML, CSS and JavaScript. Lighthouse 90+ on mobile, under a megabyte.

Open the live build holloway.ironoakweb.com
Start

Tell me what needs building.

[email protected]

Replies the same day, usually within the hour
Iron Oak Web Work © 2026